    摘要:

    高标准农田建设评价对于明确高标准农田建设状况、强化高标准农田建设监管具有重要意义,但目前面临着数据来源多样、难以统一应用于评价等问题。本研究从农田基础设施建设工程、农田地力提升工程以及工程建后管理层面构建了高标准农田建设综合评定指标体系,基于多源数据和模糊聚类,提出了一套多源数据处理的方法体系,并在西南LP县进行了应用。结果表明:高标准农田建设等级评定多源数据通过模糊聚类将其分为定性数据、定量数据以及直观数据3类。其中,定性数据模糊化处理方法通常为分级打分法;定量数据模糊化处理方法包括模糊隶属函数、最小-最大标准化等方法;直观数据模糊化处理方法通常为景观指数分析后采用分级打分法。西南LP县2019年5标段高标准农田建设项目80个评定单元大多处于三等及以上水平,总体建设水平较高。单因素评定与高标准农田建设综合评定具有一定代表性。农田基础设施建设工程质量和农田地力提升工程质量在高标准农田建设综合评定中具有较为重要的影响。通过随机森林模型筛选出对综合评定结果影响较大的5个关键影响因素,包括排水能力、灌溉能力、耕作田块面积、道路可达性以及田块标准化程度,构成高标准农田建设综合评定最小数据集。研究结果可为探索适用于全国大尺度范围的高标准农田建设等级评定及关键影响因素分析提供方法参考。

    Abstract:

    The evaluation of well-facilitated farmland construction was significant for clarifying the construction status of well-facilitated farmland and strengthening the supervision of well-facilitated farmland construction. However, problems such as diverse data sources and difficulty in unified application to evaluation were encountered. A comprehensive evaluation index system for well-facilitated farmland construction was constructed from the aspects of farmland infrastructure construction projects, farmland fertility improvement projects, and post-construction management. Based on multi-source data and fuzzy clustering, a multi-source data processing method system was applied in Southwest LP County. The results showed that fuzzy clustering was used to divide the comprehensive evaluation of well-facilitated farmland construction data into qualitative, quantitative, and intuitive data. Among them, the fuzzy processing method of qualitative data was usually a graded scoring method;the fuzzy processing methods of quantitative data included fuzzy membership function, minimum-maximum standardization, and so on. The fuzzy processing method of intuitive data was usually the grading scoring method after landscape index analysis. Most of the 80 evaluation units of well-facilitated farmland construction projects in Southwest LP County in 2019 were found to be at the third-class or above level, and the overall construction level was good. The comprehensive evaluation of single factor and well-facilitated farmland construction was shown to have certain representativeness. The quality of farmland infrastructure and fertility improvement projects was found to significantly impact the comprehensive evaluation of well-facilitated farmland construction. Five key factors affecting the comprehensive evaluation results were selected by the random forest model, including drainage capacity, irrigation capacity, cultivated field area, road accessibility, and field standardization degree, which constituted the minimum data set for the comprehensive evaluation of well-facilitated farmland construction. The research results provided a method reference for exploring the evaluation of well-facilitated farmland construction grade and key influencing factors suitable for large-scale nationwide application.

    参考文献
    相似文献
    引证文献
引用本文

郭梦雨,陈正,汤怀志,夏秋乐,沐青,周同.基于多源数据和模糊聚类的高标准农田建设等级评定及其关键影响因素分析[J].农业机械学报,2025,56(10):662-670. GUO Mengyu, CHEN Zheng, TANG Huaizhi, XIA Qiuyue, MU Qing, ZHOU Tong. Evaluation of Well-facilitated Farmland Construction Grade Based on Multi-source Data and Fuzzy Clustering and Its Key Impact Factor Analysis[J]. Transactions of the Chinese Society for Agricultural Machinery,2025,56(10):662-670.

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2024-07-12
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2025-10-10
  • 出版日期:
文章二维码